Procuring entity
|
People’s Committee
of Quy Nhon city
|
Address of Procuring
entity
|
30 Nguyen Hue street, Thi Nai ward, Quy Nhon city
|
Main content of the
project
|
a) Name of the project; Investment
objectives and investment scale of the project
- Name of the project: Long My Domestic Solid Waste Treatment
Plant using waste incineration technology combined with electricity
generation.
- Objectives and capacities: Thorough
treatment for domestic solid waste (and normal industrial waste if it is
needed by investors) with waste incineration technology combined to
electricity generation; Secondary waste (ash and slag) after treatment will
be reused and recycled, contributing to reducing waste landfilling, improving
the environment, ensuring the community health and sustainable urban
development. The factory construction is required to use advanced and modern
technology, thoroughly treat odors, ash, dust and is not required the waste
classification at source; Machinery, equipment, and processing lines must
ensure new investment, unused status.
-
Investment scale:
+
Design capacity: 500 tons of domestic solid waste/day and night with the
power generation capacity of 15 MW, as outlined in Table 7 on the List of
Waste-to-Power Projects, amended and updated under the Government's Decision
No. 1682/QD-TTg dated December 28, 2024, on approval of amendments and
updates of the Implementation plan for the National Power Development
Planning for the 2021-2030 period, with a vision towards 2050.
+ Service scope: Quy Nhon city, An Nhon town,
Tuy Phuoc district and a part
of Van Canh district. In a
long term, it will increase the volume of household solid waste based on
actual needs and expand the scope of service according to the Solid Waste
Management Plan of Binh Dinh province for the period 2023-2025, orientation
to 2030 and Master Plan of Binh Dinh province for the period 2021-2030,
vision to 2050.
+
Technology: Waste incineration
technology combined with electricity generation.
+
Services provided: Domestic solid waste treatment. For ordinary industrial
solid waste (if any), investors must comply with contracts agreed to waste
source owners according to legal regulations.
b) Total
investment capital of the project: minimum
1,500,000,000,000 VND (In words: one thousand five hundred billion Vietnam
dongs)
-
Preliminary total cost of project implementation: 1,500,000,000,000 VND (In words: one thousand five hundred billion
Vietnam dongs)
- Other costs according to regulations of law
on industry and field management (if any): None.
- Compensation, support, and resettlement
costs (if applicable): 0 VND (The State will allocate a clean site and
undertake infrastructure investment up to the project’s boundary, excluding
the water supply system for the Manufacturing plant).
c)
Project implementation location: at plot A5 and plot A6 in Long My solid
waste treatment area, Phuoc My commune, Quy Nhon city.
d) Land
use purpose; Current land use status (if any):
- Land use purpose: Construction of Long My
domestic solid waste treatment plant using waste incineration technology
combined with electricity generation. Combining waste burning to generate
electricity together with education and model tourism.
- The current land status is vacant land,
primarily acacia plantation. The Quy Nhon City People's Committee is
implementing land acquisition at Lots A5 and A6, making investment in
technical infrastructure up to the project’s boundary, and coordinating with
the Department of Agriculture and Environment to finalize the procedure for
changing the project's land use purpose from forest land.
dd) Area of land for project
implementation: Land area expected to be used is about 100,401 m2
(This area is determined on the basis of land use boundaries according to
planning and may change due to related issues of safety corridors and other
requirements of construction components, but it does not include the land
area for the factory's connection line to the National electricity system and
the connecting transportation system. For flied ash treatment location, it
will be carried out according to regulations and investors' proposals);
Priority will be given to investors who propose economical use of land.
e)
Planning targets: According to the detailed construction planning at a scale
of 1/500 of Long My solid waste treatment area, Phuoc My commune, Quy Nhon
city which has been approved and adjusted by the Provincial People's
Committee in Decision No. 3534/QD-UBND, dated September 25, 2023.
g) Project operational term and
implementation progress:
- Project
operational duration: 30 years, starting from the
date the investor decides to lease the land.
-
Project implementation progress: no more than 2 years (24 months) from the
date of issuance of investor selection results.
|
Form of investor
selection
|
Open bidding
|
Method of selecting
investors
|
One bag of documents
for each stage
|
Time to issue bidding
documents
|
From 7:00 on 21/3/2025 to
14:00 on 20/5/2025
(during office hours).
|
Location for issuing
bidding documents and receiving bid documents
|
Department of
Economics, Infrastructure and Urban Affairs - 7th Floor, City Administrative
Center, 30 Nguyen Hue, Thi Nai Ward, Quy Nhon City.
Phone No.:
0256.3822176, Fax: 0256.3826076.
|
Selling price of 01 set
of bidding documents
|
30,000,000
VND (In words: Thirty million Vietnam dongs even).
|
Bid guarantee
|
15,000,000,000
VND (In words: Fifteen billion Vietnam dongs even)
|
Bid opening location
|
30 Nguyen Hue Street, Thi Nai Ward, Quy Nhon City.
|
Time of bid closing
|
14:00 on 20/5/2025
|
Bid opening time
|
15:00 on 20/5/2025
|